Capacity of solar system
» &lamp; 1 MWp
Conditions:
» 100% of your Sanctioned Load
» Cumulative capacity of all solar systems installed in your area shall not exceed 15% of distribution transformer capacity in your area
Ownership options
» Self ownership (CAPEX model)
Billing Mechanism
» Annual settlement
Others
» Mandatory for all Commercial complexes, Offices, Malls, etc. (existing as well as new buildings) having Connected Load of 50 kW and above to install 3% to 5% capacity of their Connected Load of solar.
» No permission is required from the building plan sanctioning authority for setting up of rooftop solar power plants.